C7 Industrial Engines Disassembly and Assembly – Gear Group (Front) – Install

Installation Procedure

  1. Install idler gear assembly (9) and retaining plate (8) on the engine oil pump. Install bolt (7) .

 

  1. Check the end play for the gear assembly. The end play for the gear assembly is 0.05 to 0.35 mm (0.002 to 0.014 inch).

 

  1. Use Tooling (A) to install bearing (5) in idler gear assembly (3) .

 

  1. Align the timing marks on idler gear assembly with the holes on the camshaft gear and the crankshaft gear. Install thrust plate (1) , idler shaft (2) , idler gear assembly (3) , and retaining plate (6) on the cylinder block. Install bolts (4) and tighten to a torque of 70 ± 15 N·m (52 ± 11 lb ft).

 

  1. Calibrate the speed/timing sensor. Refer to Troubleshooting, “Engine Speed/Timing Sensor – Calibrate ” for the calibration procedure.

End By: Install the front housing. Refer to Disassembly and Assembly, “Housing (Front) – Install”.

Posted in C7

Leave a Reply

Your email address will not be published. Required fields are marked *