Assembly Procedure
Clean the injection actuation pressure control valve and the components for the injection actuation pressure control valve.
Illustration 1 g01011197
(1) O-ring seal
(2) Nut
(3) Backup ring
(4) O-ring seal
(5) Solenoid valve
(6) Spacer
Install new O-ring seals (1) and (4), and backup ring (3) on the injection actuation pressure control valve. Lubricate the O-ring seals with clean engine oil.
How pressure for engine oil