C3.3B Tier 4 Interim and EU Stage 3A Engines for Caterpillar Built Machines – Coolant Tank – Remove and Install

Removal Procedure




    Illustration 1g02896816

  1. Disconnect hose (3). Remove bolts (2) to remove expansion tank (1) .

Installation Procedure

  1. Install expansion tank (1) in the reverse order of removal.

Leave a Reply

Your email address will not be published. Required fields are marked *