259D Compact Track Loader – Alternator – Remove and Install

Removal Procedure

Start By:

  1. Remove V belt.

  1. Turn the battery disconnect to the OFF position.



    Illustration 1g02798717

  1. Disconnect harness assemblies (2) and (3) from alternator (1) .

  1. Remove nut (4) .



    Illustration 2g02798718

  1. Remove nut (7) and pulley (6) .

  1. Remove bolts (5) and (6) .

  1. Remove alternator (1) .

Installation Procedure

  1. Install alternator (1) in the reverse order of removal.

    1. Ensure pulley (6) is correctly oriented.

    1. Tighten nut (7) to a torque of 58 to 79 N·m (43 to 58 lb ft).

Leave a Reply

Your email address will not be published. Required fields are marked *