Before you test the ether injection system, remove the ether canister from the system.
Use this procedure to troubleshoot any suspect problems with the ether injection system.
Illustration 1 g01213005
Schematic of the ether injection system
Illustration 2 g01167488
Engine view (typical example)
(1) J1/P1 ECM connectors
Illustration 3 g01146383
Engine view (typical example)
(2) P61 customer connector
Illustration 4 g01170983
Ether starting aid group (typical example)
(3) Ether injection solenoid
Illustration 5 g01212950
P1 terminals for the ether injection system
(P1-10) Ether injection solenoid
(P1-22) Override switch
Illustration 6 g01212957
P61 terminals for the ether injection system
(22) Ether injection solenoid
(38) Override switch
Illustration 7 g01155187
Terminal locations at the harness connector for the ether solenoid
(1) Ether injection solenoid
(2) Chassis ground